You are here: Home > Products > Cost Estimation Indexes

PRODUCT ENGINEERING, TRANSITIONAL, WORKSTATION, ZONE INFORMATION PREPARATION.
CONCURRENT ENGINEERING AND IPPD.
SHIP DESIGN AND ANALYSIS TOOLS LINKED INTO INTEGRATED DESIGN SYSTEMS.
DESIGN PHILOSOPHY AS WEIGHTED LIST OF DESIRED DESIGN/SHIP ATTRIBUTES.
FINITE ELEMENT STRUCTURAL ANALYSIS (FEA).
DESIRED BALANCE BETWEEN CAPABILITY AND AFFORDABILITY.
SPEED TRIALS ESTABLISHMENT OF SPEED/RPM RELATIONSHIPS, CORRELATION WITH MODEL TEST PREDICTIONS.
SHIP ESTIMATION RELATIONSHIPS DERIVED FROM PARAMETRIC ANALYSES OF THE BODY OF DATA ON EXISTING SHIPS.
APPROACHES TO ADVANCED OUTFITTING, SHIP ASSEMBLY AND CONSTRUCTION.
PWBS HIERARCHY COMPLEXITY FACTORS ALIGNED TO BUILDING STRATEGY.

Cost Estimation Indexes.

Service Engineering Man Hours Based.

The very fundamental step after preparing your plan is project cost estimation and costing have to be prepared for the further ideas of your ship or boat building. .Estimation is the process of finding the required quantity of materials needed for your construction and rate analysis is the method to find the price of each for your constructional unit. The estimation and costing have done with the help of a our project estimator. For this, you need some data required to prepare the estimate of the engineering fot shipbuilding or the ship related project as calculation/report application, estimated man-hours, and rates.

Calculation / Plan / Report | Naval Architecture

+



>ROMV® | ShipDesign Services

Calculation / Report man-hours estimation

Calculation / Plan / Report | Equipment & Machinery Engineering

+



>ROMV® | ShipDesign Services

Calculation / Report man-hours estimation

Cost Estimation | Required Data

+

>ROMV® | Cost Data

  1. Drawings of your shipbuilding plan.

    The must required data to prepare estimation and consisting is basic drawings of your vessels. The drawings should not rough, all the dimensions and drawing should be clear. If you want to add some extra drawings after the execution of your estimation. The estimation of that extra work is called as Supplementary Estimate.

  2. Specifications.

    Specifications are classified into general and detailed. In general specifications, we talk about needed materials and works in general perspective. Detailed specifications give you an idea about the quality, quantity, method of preparations and proportions of the work have to be done.

  3. Rates.

    After estimating the drawings and required materials, the next data to be collected is the rate of the materials.To do this we need to make rate analysis of the ship or boat. Rate analysis of materials involves Finding the rates of each item involved in the ship construction process. Their transportation costs. The other required rates are the rates of labors, painters, masons, carpenters etc..

  4. Lump sum items during project estimation.

    As a naval architects or marine engineers, the worst situation comes, when we don’t have much experience in taking other measurements such as electricity, sanitary arrangements etc… Even the items which is not related to naval engineering are called as lump sum items. Some lump sum items are. 1.Architectural Items 2.Electrical installations such as fan, motor, insulations, light etc.. 3. Sanitary arrangements In order to make correct project cost estimation, you should also make an estimation of lump sum items with the help of estimator working in that field.

  5. Work Charge Establishment.

    During the construction of your ship or boat, you may need to arrange some skilled workers to do some specific purpose for your shipbuilding like supervisors, watchmen, project managers etc..You also need to fix salaries of these workers and add on to the estimation and costing.

To request an advice for your ship design project, please contact to:

ROMV & Associates, Ship Design Services